Tooheys Brewhouse-
Stage 2
Our involvement with this
project entailed Motor Control Centres with
Star Delta Drives, Variable
Speed Drives and DOL Starters.
All Motor Control Centres
were constructed from Stainless Steel materials.
The Main Switchboards installation
included 2000 AMP Bus Ties
The workmanship was extremely
well done and in accordance with
the best modern trade practices,
leaving a thorough, safe and efficient job.
The drawings for both projects
were prepared on behalf of
S&F Electrical Manufacturers
by
the company's Managing Director,
Mr. Fawad Yaqub.
The project was completed
in 1993 with
the assistance of Transfield
Electrical
|