List of measures

Utilisation

3.1.1

% of busy hour call attempts completed

%

No.

List of measures

Reliability

3.2.1

Number of of trunk switch faults reported p.a. per 4kHz/56kbps/64kbps channel equivalent in use

#

3.2.2

% of trunk switch faults reported again within 30 days of first fault (repeat faults)

%

Network Development

No.

List of measures

Labour productivity

Capital productivity (excluding labour costs)

Total Productivity (including labour costs)

3.3.1

Trunk switch procurement & installation manhours per additional 4kHz/56kbps/64kbps channel equivalent of trunk switch capacity deployed

H

3.3.2

PDH port procurement & installation manhours per additional E1/T1 channel equivalent of PDH port capacity deployed

H

3.3.3

SDH port procurement & installation manhours per additional STM-1 channel equivalent of SDH port capacity deployed

H

3.3.4

Trunk switch equipment cost per additional 4kHz/56kbps/64kbps channel equivalent of trunk switch capacity deployed

$

3.3.5

PDH port equipment cost per additional E1/T1 channel equivalent of PDH port capacity deployed

$

3.3.6

SDH port equipment cost per additional STM-1 channel equivalent of SDH port capacity deployed

$

3.3.7

Total average trunk switch cost per additional 4kHz/56kbps/64kbps channel equivalent of trunk switch capacity deployed

$

3.3.8

Total average PDH port cost per additional E1/T1 channel equivalent of PDH port capacity deployed

$

3.3.9

Total average SDH port cost per additional STM-1 channel equivalent of SDH port capacity deployed

$

Operations & Maintenance

No.

List of measures

Labour productivity

Total Productivity (including labour costs)

3.4.1

Average time from reported to cleared trunk switch fault

H

3.4.2

Total trunk switch O&M manhours per 4kHz/56kbps/64kbps channel equivalent in use

H

3.4.3

Total trunk switch O&M cost per 4kHz/56kbps/64kbps channel equivalent in use

$

Again, all national averages (ignore rural/urban etc) over the last 12 months

Specify which 12 month period, but give option of defining own if the one given is unsuitable/unable to collect data for it.

Procurement and installation of switches includes costs/manhours associated with the purchasing procedure of the switch, including the switch cost and installation and supervision (if the work is contracted out).

Labour costs and man hours should be direct labour costs and man hours, including those associated with supervision and direct clerical support, but should not include allocated overhead such as management and R&D.

Network - Switching number of measures:

15