List of measures

Utilisation

1.1.1

% of copper access pair km in use of total copper access pair deployed

%

1.1.2

% of fibre access pair km in use of total fibre access pair deployed

%

1.1.3

% of PDH access capacity in use of total PDH access capacity deployed (E1/T1 channel equivalents)

%

1.1.4

% of SDH access capacity in use of total SDH access capacity deployed (STM-1 channel equivalents)

%

1.1.5

% of new copper access pair connections provided using existing copper access pairs

%

1.1.6

% of new fibre access pair connections provided using existing fibre access pairs

%

1.1.7

% of new PDH access connections provided using existing PDH equipment (E1/T1 channel equivalents)

%

1.1.8

% of new SDH access connections provided using existing SDH equipment (STM-1 channel equivalents)

%

No.

List of measures

Reliability

1.2.1

Number of copper access faults reported p.a. per copper access pair in use

#

1.2.2

Number of fibre access faults reported p.a. per fibre access pair in use

#

1.2.3

Number of PDH access equipment faults reported p.a. per E1/T1 channel equivalent in use (end-to-end)

#

1.2.4

Number of SDH access equipment faults reported p.a. per STM-1 channel equivalent in use (end-to-end)

#

1.2.5

% of copper access faults reported again within 30 days of first clear (repeat faults)

%

1.2.6

% of fibre access faults reported again within 30 days of first clear (repeat faults)

%

1.2.7

% of PDH access equipment faults reported again within 30 days of first clear (repeat faults)

%

1.2.8

% of SDH access equipment faults reported again within 30 days of first clear (repeat faults)

%

Network Development

No.

List of measures

Labour productivity

Capital productivity (excluding labour costs)

Total Productivity (including labour costs)

1.3.1

Design and build man hours per copper access pair km to be deployed

H

1.3.2

Design and build man hours per fibre access pair km to be deployed

H

1.3.3

PDH access equipment procurement and installation man hours per E1/T1 channel equivalent to be deployed (end-to-end)

H

1.3.4

SDH access equipment procurement and installation man hours per STM-1 channel equivalent to be deployed (end-to-end)

H

1.3.5

Copper access materials cost per copper access pair km to be deployed

$

1.3.6

Fibre access materials cost per fibre access pair km to be deployed

$

1.3.7

PDH access equipment cost per E1/T1 channel equivalent to be deployed (end-to-end)

$

1.3.8

SDH access equipment cost per STM-1 channel equivalent to be deployed (end-to-end)

$

1.3.9

Total average copper access cost per copper access pair km to be deployed

$

1.3.10

Total average fibre cost per fibre access pair km to be deployed

$

1.3.11

Total average PDH access cost per E1/T1 channel equivalent to be deployed (end-to-end)

$

1.3.12

Total average SDH access cost per STM-1 channel equivalent to be deployed (end-to-end)

$

Operations & Maintenance

No.

List of measures

Labour productivity

Total Productivity (including labour costs)

1.4.1

Average time from reported to cleared copper access pair fault

H

1.4.2

Average time from reported to cleared fibre access pair fault

H

1.4.3

Average time from reported to cleared PDH access equipment fault

H

1.4.4

Average time from reported to cleared SDH access equipment fault

H

1.4.5

Total copper access plant O&M man hours per copper pair km in use

H

1.4.6

Total fibre access plant O&M man hours per fibre pair km in use

H

1.4.7

Total PDH access plant O&M man hours per E1/T1 channel equivalent in use

H

1.4.8

Total SDH access plant O&M man hours per STM-1 channel equivalent in use

H

1.4.9

Total copper access plant O&M costs per copper pair km in use

$

1.4.10

Total fibre access plant O&M costs per fibre pair km in use

$

1.4.11

Total PDH access plant O&M costs per E1/T1 channel equivalent in use

$

1.4.12

Total SDH access plant O&M costs per STM-1 channel equivalent in use

$

National average for the last 12 months (specify period).

Labour costs and man hours should be direct labour costs and man hours, including those associated with supervision and direct clerical support, but should not include allocated overhead such as management and R&D.

Network - Local Access number of measures:

40

Copyright Analysys 1999